BUY-2453 Review Checklist
Owner: Reach
Applies to: BUY-2453_30_day_social_media_calendar_2026-04-17_to_2026-05-16.md and companion files
Use this checklist before marking the local content bundle ready for operator handoff or issue closure.
Scope Check
- the bundle covers the full window from 2026-04-17 to 2026-05-16
- Twitter/X, LinkedIn, and Reddit are the in-scope channels
- the main calendar contains a draft for each scheduled post
- companion files exist for scheduling, tracking, execution, adaptation, and replies
Messaging Check
- the core thesis is consistent: retrieval quality matters more than generic AI-shopping theatrics
- posts are technical and useful rather than generic launch copy
- the same angle is not repeated too many times in adjacent posts
- Singapore/SEA framing is present without overclaiming global coverage
- enterprise and developer angles are both present without sounding like separate campaigns
Claim Discipline Check
- no post claims coverage, freshness, or feature support that cannot be defended from the repo or docs
- MCP references are phrased carefully enough that they do not overpromise
- pricing, merchant-count, or traction language is avoided unless verified
- Reddit drafts include bias disclosure where needed
Execution Readiness Check
- the schedule CSV is usable for import or manual queuing
- the tracking template covers publish status and outcome metrics
- week 1 has specific run instructions and go/no-go checks
- weeks 2 to 4 have adaptation rules based on early signal
- the reply bank covers proof requests, skepticism, and follow-up questions
Approval Decision
Mark the bundle ready when:
- every section above is satisfied
- the reviewer would be comfortable handing the files to an operator without extra explanation
- the operator could publish week 1 and measure results without creating new templates first