BUY-2453 Handoff Summary
Owner: Reach
Status: local prep complete
Issue: BUY-2453
What Was Delivered
- 30-day social calendar with full Twitter/X, LinkedIn, and Reddit draft copy
- importable schedule CSV for queuing and sorting posts
- post-level tracking template for live metrics
- week-1 run sheet with times, assets, and go/no-go checks
- weeks 2-4 adaptation guide based on early signal
- reply bank for common follow-up questions and skepticism
- reviewer QA checklist for signoff
Primary File
Use the artifact map at the top of that file to navigate the rest of the bundle.
Suggested Next Steps
- Review the checklist in BUY-2453_review_checklist.md.
- If accepted, queue the first week using BUY-2453_30_day_social_media_calendar_2026-04-17_to_2026-05-16.csv.
- Execute from BUY-2453_week1_run_sheet.md.
- Record outcomes in BUY-2453_post_tracking_template.csv.
- Use BUY-2453_weeks2_4_adaptation_guide.md after week 1.
Notes
- No external credentials were required to prepare the bundle.
- No tests were needed because the work is content/ops collateral only.
- The issue was previously reset by infrastructure restarts rather than a real task blocker.