← Back to documentation

BUY-2453_handoff_summary

BUY-2453 Handoff Summary

Owner: Reach
Status: local prep complete
Issue: BUY-2453

What Was Delivered

  • 30-day social calendar with full Twitter/X, LinkedIn, and Reddit draft copy
  • importable schedule CSV for queuing and sorting posts
  • post-level tracking template for live metrics
  • week-1 run sheet with times, assets, and go/no-go checks
  • weeks 2-4 adaptation guide based on early signal
  • reply bank for common follow-up questions and skepticism
  • reviewer QA checklist for signoff

Primary File

Use the artifact map at the top of that file to navigate the rest of the bundle.

Suggested Next Steps

  1. Review the checklist in BUY-2453_review_checklist.md.
  2. If accepted, queue the first week using BUY-2453_30_day_social_media_calendar_2026-04-17_to_2026-05-16.csv.
  3. Execute from BUY-2453_week1_run_sheet.md.
  4. Record outcomes in BUY-2453_post_tracking_template.csv.
  5. Use BUY-2453_weeks2_4_adaptation_guide.md after week 1.

Notes

  • No external credentials were required to prepare the bundle.
  • No tests were needed because the work is content/ops collateral only.
  • The issue was previously reset by infrastructure restarts rather than a real task blocker.